Delivery
The life of the plant, under one company.
From the survey before anyone mobilizes to the day the plant comes down. Generation, storage, emergency generation, and the distribution equipment that serves a commercial load.
- 01
Before notice to proceed
Site development
Surveys, feasibility, permitting, interconnection, and the distribution path to the load. The scope is written down before a crew is on the clock.
- 02
Before notice to proceed
Engineering
Design against the same specification used to buy the equipment. Generation, storage, standby, and distribution gear are one set of drawings, not four vendors left to sort it out.
- 03
Supply
Procurement
Major equipment is purchased to a written spec. Price and lead time are managed before the crew is standing in the yard.
- 04
Supply
Warehousing and logistics
Regional storage and delivery from the supplier to the site gate. The job should not wait on a truck that was never scheduled.
- 05
Build
Construction
Regional contractors do the installation. Supervision, the safety program, and the quality checks travel with the standard, not with whichever office won the work.
- 06
Build
Commissioning and QA / QC
Field inspection, hold points, and final tests, including a test of emergency generation where it is in the scope. Energization is a gate. A punch list left for the owner is not commissioning.
- 07
Keep
Operations and maintenance
Preventive maintenance, response when something fails, and performance records an owner can read. Resources that are meant to be called together are operated from that record.
- 08
Keep
Warranty
Claims, replacements, and the paperwork that ties a failure in the field back to the unit that was installed.
- 09
Later
Repowering
Replace what no longer earns its keep. The decision sits on production, condition, and what the load needs now, not on a calendar alone.
- 10
Later
Decommissioning
Removal, recycling, and restoration to the standard the site requires. The last day of the plant is still part of the job.
Engineering, procurement, and construction deliver the plant. Operations keeps it. The drawings do not change hands and get reinvented. The resource type does not earn the plant a second standard.
Name the work.
A load that needs power, a site to develop, a crew, or a project to sell.