Delivery

The life of the plant, under one company.

From the survey before anyone mobilizes to the day the plant comes down. Generation, storage, emergency generation, and the distribution equipment that serves a commercial load.

  1. 01

    Before notice to proceed

    Site development

    Surveys, feasibility, permitting, interconnection, and the distribution path to the load. The scope is written down before a crew is on the clock.

  2. 02

    Before notice to proceed

    Engineering

    Design against the same specification used to buy the equipment. Generation, storage, standby, and distribution gear are one set of drawings, not four vendors left to sort it out.

  3. 03

    Supply

    Procurement

    Major equipment is purchased to a written spec. Price and lead time are managed before the crew is standing in the yard.

  4. 04

    Supply

    Warehousing and logistics

    Regional storage and delivery from the supplier to the site gate. The job should not wait on a truck that was never scheduled.

  5. 05

    Build

    Construction

    Regional contractors do the installation. Supervision, the safety program, and the quality checks travel with the standard, not with whichever office won the work.

  6. 06

    Build

    Commissioning and QA / QC

    Field inspection, hold points, and final tests, including a test of emergency generation where it is in the scope. Energization is a gate. A punch list left for the owner is not commissioning.

  7. 07

    Keep

    Operations and maintenance

    Preventive maintenance, response when something fails, and performance records an owner can read. Resources that are meant to be called together are operated from that record.

  8. 08

    Keep

    Warranty

    Claims, replacements, and the paperwork that ties a failure in the field back to the unit that was installed.

  9. 09

    Later

    Repowering

    Replace what no longer earns its keep. The decision sits on production, condition, and what the load needs now, not on a calendar alone.

  10. 10

    Later

    Decommissioning

    Removal, recycling, and restoration to the standard the site requires. The last day of the plant is still part of the job.

Engineering, procurement, and construction deliver the plant. Operations keeps it. The drawings do not change hands and get reinvented. The resource type does not earn the plant a second standard.