Solutions
Power a customer can budget, and count on.
The work is the cost of energy and the supply behind it. Generation, storage, emergency generation, and distribution equipment, specified for a commercial load and kept in service after energization.
- 01
Distribution
The path from the resource to the load, and to the grid when the contract says so.
Service equipment, interconnection, and the gear between the plant and the wires that serve the site. A resource that cannot deliver power is not a finished plant.
- 02
Distributed energy resources
Generation and storage sited with the load they serve.
Solar belongs here when it is the right resource for the site. So do storage and other generation. The resource is chosen for the load, the interconnection, and the contract.
- 03
Virtual power plants
Many distributed resources operated so they can be called as one.
The sites stay where they are. The work is metering, control, and a record of performance the grid can call on. Many resources, one operating method.
- 04
Emergency generation
Generation that can start when utility supply is short or out.
Fuel on site, a transfer scheme, and a test record. Standby power is part of reliability, specified with the rest of the plant.
What the contract states
Predictable cost means a customer can put the price of power in a budget and leave it there for the term of the agreement.
- The price of the power, or the fee for keeping the plant available, for a stated term.
- Who owns the asset, who takes the power, and who operates the plant.
- Who carries construction, so that cost is settled before the crew mobilizes.
- The distribution path from the resource to the load, and to the grid when the contract includes it.
Engagement
How a customer engagement runs
- 01
Name the load
What the site uses, what it cannot afford to lose, and how power is bought today.
- 02
Define the resources
Generation, storage, emergency generation, and the distribution equipment. Solar is used where it earns its place.
- 03
Write the cost
Rate or availability fee, term, owner, and operator. The budget can be written from the contract.
- 04
Build to the standard
One specification, one safety program, and commissioning that proves the plant before handoff.
- 05
Stay on the plant
Operations, maintenance, and a record of performance. The company that built it does not disappear at energization.
Proof sits on the project record.
Named projects and system totals are published when the figures are final. Until then, the proof a customer can read is the contract, the specification, and the commissioning file.
Read the project recordBring the load.
Tell us the site, what it uses, and what it cannot afford to lose.